Special Heating Equipment for Extra Large Workpieces

The exhaust gas fan failed in the processing facility of a chemical plant. The plant operator was forced to replace the rolling bearing quickly due to the toxic gases and the resulting explosive atmosphere that occurred in the chemical production process. However, it was very difficult to access the standard spherical roller bearing, with which the fan was originally fitted. Experience had shown that a mounting time of approximately 14 hours had to be expected in such cases.

This article is available in English Only.

Attachments (1) Attachments

  • Type: Supplier Solution
5 (3)
Article Rating (3 Votes)
Rate this article

Rating Feedback

Thanks for Voting.

What can we do to make this article better? Include your name and email or phone number if you would like us to contact you. Otherwise, your response will be anonymous.

Name:
Email:
Phone:
Comment:
 
  • Icon PDFExport to PDF
Comments Comments
There are no comments for this article. Be the first to post a comment.
Icon Add Comment
Full Name *
Email Address * (Required, but not published)
Comment *
Security Code Security Code
 
Related Articles RSS Feed
Wolverine Oven Bearings Downtime Costing Hundreds - 5118
Viewed 116 time(s) since Jul 11, 2018
Premature Bearing Failure in Autoclave Bogie Wheel - 5241
Viewed 35 time(s) since Jul 30, 2018
Cement Operations Require Tough Steel - 1396
Viewed 379 time(s) since Oct 23, 2015
NSK Condition Monitoring Service Saves Time & Money - 5210
Viewed 35 time(s) since Jul 30, 2018
Mining Conveyor Application was Causing Headaches - 5236
Viewed 80 time(s) since Jul 30, 2018
Roof Tiles Were a Re-Greasing Mess - 5239
Viewed 43 time(s) since Jul 30, 2018
Vegetable Wash Application a Washout - 5202
Viewed 52 time(s) since Jul 27, 2018
Reliable Brass Worm Gear Monitoring - 5308
Viewed 99 time(s) since Aug 15, 2018
SmartLUBE Delivers for Midwest Bakery - 343
Viewed 1008 time(s) since Dec 4, 2014
Rexnord Power Transmission Products Solutions for Cement Processing - 2489
Viewed 207 time(s) since Mar 7, 2017